Competitive Software Engineering MCQs – Latest Software Metrics MCQs

Competitive Software Engineering MCQs – Latest Software Metrics MCQs

This post is comprising of latest ” Software Metrics MCQs – Latest Competitive Software Engineering MCQs “. Here you’ll get latest Software engineering mcqs for written test, interview with answers. If you want to improve your knowledge regarding Software engineering then read these mcqs of Design of Steel Structures.

Latest Software Engineering MCQs

By practicing these MCQs of Software Metrics MCQs – Latest Competitive Software Engineering MCQs , an individual for exams performs better than before. This post comprising of mechanical engineering objective questions and answers related to Software Metrics Mcqs “. As wise people believe “Perfect Practice make a Man Perfect”. It is therefore practice these mcqs of Software engineering to approach the success. Tab this page to check “Software Metrics” for the preparation of competitive mcqs, FPSC mcqs, PPSC mcqs, SPSC mcqs, KPPSC mcqs, AJKPSC mcqs, BPSC mcqs, NTS mcqs, PTS mcqs, OTS mcqs, Atomic Energy mcqs, Pak Army mcqs, Pak Navy mcqs, CTS mcqs, ETEA mcqs and others.

Latest Software Metrics Mcqs

The most occurred mcqs of Software Metrics in past papers. Past papers of Software Metrics Mcqs. Past papers of Software Metrics Mcqs . Mcqs are the necessary part of any competitive / job related exams. The Mcqs having specific numbers in any written test. It is therefore everyone have to learn / remember the related Software Metrics Mcqs. The Important series of Software Metrics Mcqs are given below:

Cost and schedule are a part of_________________________?

A. Process Metrics
B. Product Metrics
C. Project Metrics
D. All of the mentioned

Number of errors found per person hours expended is an example of a____________________?

A. measure
B. measurement
C. metric
D. all of the mentioned

Size and Complexity are a part of____________________?

A. Product Metrics
B. Project Metrics
C. Process Metrics
D. All of the mentioned

Which of the following is not categorized under Product Operation of McCall’s Software Quality Factors ?

A. Flexibility
B. Usability
C. Reliability
D. Integrity

Which of the following is not categorized under Component-Level Design Metrics ?

A. Cohesion Metrics
B. Complexity Metrics
C. Morphology Metrics
D. Coupling Metrics

Software Design Mcqs

MTTC falls the the category of____________________?

A. integrity
B. correctness
C. maintainability
D. all of the mentioned

The arc-to-node ratio is given as r = a/n. What does ‘a’ represent in the ratio ?

A. maximum number of nodes at any level
B. number of modules
C. longest path from the root to a leaf
D. lines of control

Percentage of modules that were inspected is a part of__________________?

A. Project Metrics
B. Process Metrics
C. Product Metrics
D. All of the mentioned

Identify the correct option with reference to Software Quality Metrics ?

A. Integrity = [1 – Sigma(threat)] * (1 – security)
B. Integrity = [Sigma(1 – threat)] * (1 – security)
C. Integrity = [1 – threat * Sigma(1 – security)]
D. Integrity = Sigma[1 – threat * (1 – security)]

Usability in metric analysis is defined as the degree to which the software_________________?

A. makes optimal use of system resources
B. is easy to use
C. stated needs
D. none of the mentioned

The amount of time that the software is available for use is known as_________________?

A. Reliability
B. Efficiency
C. Usability
D. Functionality

Software Management Mcqs

SMI stands for_______________?

A. Software Mature Index
B. Software Maturity Index
C. Software Mature Indicator
D. Software Maturity Indicator

Function Points in software engineering was first proposed by_______________?

A. Boehm
B. Booch
C. Albrecht
D. Jacobson

Which of the following is not a web engineering project metric ?

A. Number of Dynamic Content Objects
B. Number of Static Content Objects
C. Number of Inherited Objects
D. Word Count

Which of the following is not a metric for design model ?

A. Component-level metrics
B. Interface design metrics
C. Architectural metrics
D. Complexity metrics

How many Information Domain Values are used for Function Point Computation ?

A. four
B. three
C. five
D. six

Architectural Design Metrics are ______________ in nature ?

A. Black Box
B. Gray Box
C. White Box
D. Green Box

SMI = [Mt – (Fa + Fc + Fd)]/Mt. Here Mt is the number of modules______________?

A. in the current release
B. from the preceding release that were deleted in the current release
C. in the current release that have been changed
D. none of the mentioned

Structural complexity of a module i is given as S(i) = f*f (i). What does f symbolizes here ?

A. “fan check-in” of module i
B. “fan check-out” of module i
C. “fan in” of module i
D. “fan out” of module i

Function Point Computation is given by the formula___________________?

A. FP = count total * [0.65 + 0.01] * sum(Fi)
B. FP = count total * [0.65 + 0.01 * sum(Fi)].
C. FP = [count total * 0.65] + 0.01 * sum(Fi)
D. FP = [count total * 0.65 + 0.01] * sum(Fi)

Statement and branch coverage metrics are part of______________________?

A. Design Model
B. Testing
C. Analysis Model
D. Source Code

Requirement Engineering Mcqs

Which of the following is not a classification of the web engineering metric, Web Page Similarity ?

A. Link based
B. Content based
C. Usage based
D. Traffic based

How is the complexity of a web page related to link count ?

A. Directly
B. No relation
C. Indirectly
D. All of the mentioned

Which metric gives the idea about the contents on a web page ?

A. Word Size
B. Word Count
C. Word Token
D. Word Length

Number of dynamic web pages provides an idea about____________ for a web page that is to be built?

A. complexity
B. size
C. effort
D. all of the mentioned

Link based measures rely on _____________ structure of a web graph to obtain related pages?

A. Dynamic
B. Hyperlink
C. Embedded
D. All of the mentioned

Which of the following web engineering metric measures the extent of relatedness between two or more web pages ?

A. Number of Dynamic Content Objects
B. Number of Static Content Objects
C. Web Page Similarity
D. Number of Internal Page Links

Usability can be measured in terms of_________________?

A. Net increase in productivity
B. Time required to become moderately efficient in system usage
C. Intellectual skill to learn the system
D. All of the mentioned

Which of the following is not a direct measure of SE process ?

A. Efficiency
B. Effort Applied
C. Cost
D. All of the mentioned

Which of the following does not affect the software quality and organizational performance ?

A. Market
B. Technology
C. Product
D. People

Which of the following is an indirect measure of product ?

A. Complexity
B. Quality
C. Reliability
D. All of the Mentioned

A graphical technique for finding if changes and variation in metrics data are meaningful is known as_________________?

A. Function points analysis
B. DRE (Defect Removal Efficiency)
C. Control Chart
D. All of the mentioned

In size oriented metrics, metrics are developed based on the _____________________?

A. number of user inputs
B. number of Functions
C. number of lines of code
D. amount of memory usage

Defects removal efficiency (DRE)depends on ______________________?

A. D – defects found after delivery to user
B. E – errors found before software delivery
C. Both E and D
D. Varies with project

The intent of project metrics is_____________________?

A. for strategic purposes
B. minimization of development schedule
C. assessing project quality on ongoing basis
D. minimization of development schedule and assessing project quality on ongoing basis

Which of the following is the task of project indicators ?

A. track potential risk
B. help in assessment of status of ongoing project
C. help in assessment of status of ongoing project & track potential risk
D. none of the mentioned

Which of the following is not an information domain required for determining function point in FPA ?

A. Number of user Inquiries
B. Number of user Input
C. Number of external Interfaces
D. Number of errors

Competitive Software Engineering MCQs – Latest Software Metrics MCQs