Blog

Keep up to date with the latest news

Production Technology MCQs Latest – MCQs Competitive Mechanical Engineering

Production Technology MCQs Latest – MCQs Competitive Mechanical Engineering

This post is comprising of latest “Production Technology MCQs Latest – Competitive Mechanical Engineering MCQs “. Here you’ll get latest mechanical engineering mcqs for written test, interview with answers. If you want to improve your knowledge regarding mechanical engineering then read these mcqs of Design of Steel Structures.

Latest Mechanical Engineering MCQs

By practicing these MCQs of Mechanical Engineering MCQs – Production Technology Mcqs, an individual for exams performs better than before. This post comprising of mechanical engineering objective questions and answers related to Production Technology Mcqs“. As wise people believe “Perfect Practice make a Man Perfect”. It is therefore practice these mcqs of mechanical engineering to approach the success. Tab this page to check “Latest Production Technology Mcqs” for the preparation of competitive mcqs, FPSC mcqs, PPSC mcqs, SPSC mcqs, KPPSC mcqs, AJKPSC mcqs, BPSC mcqs, NTS mcqs, PTS mcqs, OTS mcqs, Atomic Energy mcqs, Pak Army mcqs, Pak Navy mcqs, CTS mcqs, ETEA mcqs and others.

Latest Production Technology Mcqs

The most occurred mcqs of Production Technology in past papers. Past papers of Production Technology Mcqs. Past papers of Production Technology Mcqs . Mcqs are the necessary part of any competitive / job related exams. The Mcqs having specific numbers in any written test. It is therefore everyone have to learn / remember the related Production Technology Mcqs. The Important series of Production Technology Mcqs are given below:

Basic tool in work study is __________________?

A. process chart
B. graph paper
C. planning chart
D. stop watch
E. analytical mind

What does symbol ‘D’ imply in work study ___________________?

A. transport
B. inspection
C. delay/temporary storage
D. permanent storage
E. none of the above

Material handling in automobile industry is done by_________________?

A. overhead crane
B. belt conveyor
C. trolley
D. all of the above
E. none of the above

Work study is most useful_______________?

A. where production activities are involved
B. in improving industrial relations
C. in judging the rating of machines
D. in judging the output of a man and improving it
E. where men are biggest contributor to success of a project

Machine Design Mcqs

In micromotion study, therblig is described by_______________?

A. an event
B. a symbol
C. an activity
D. micro motions
E. standard symbol and colour

Micromotion study involves following number of fundamental hand motions_______________?

A. 12
B. 8
C. 16
D. 20
E. 24

Work study is done with the help of_______________?

A. material handling
B. process chart
C. stop watch
D. all of the above
E. none of the above

Expediting function consists in keeping a watch on__________________?

A. minimising the delays
B. flow of material and in case of trouble locate source of trouble
C. operator’s activity
D. making efficient despatching
E. none of the above

Job evaluation is the method-of determining the________________?

A. relative worth of jobs
B. contribution of a worker
C. skills required by a worker
D. contribution of a job
E. effectiveness of various alternatives

Per cent idle time for men or machines is found by___________________?

A. work sampling
B. method study
C. time study
D. work study
E. ABC analysis

Time study is__________________?

A. the appraisal, in terms of time, of the value of work involving human effort
B. time taken by workers to do a job
C. machine setting time
D. method of fixing time for workers
E. method of determining the personal Requirement

One time measurement unit (TMU) in method time measurement system equals______________?

A. 0.006 minute
B. 0.0006 minute
C. 0.0001 minute
D. 0.001 minute
E. 0.06 minute

Motion study is used for________________?

Choose the wrong statement?

A. improvising a work method
B. improving a work method
C. designing a work method
D. providing a schematic framework
E. reducing inventory costs

ABC analysis deals with_________________?

A. flow of material
B. analysis of process chart
C. ordering schedule of job
D. controlling inventory costs money
E. all of the above

For a product layout the material handling equipment must _________________?

A. be a general purpose type
B. employ conveyor belts, trucks, tractors etc.
C. have full flexibility
D. be designed as special purpose for a particular application
E. arranging shops according to specialization of duties

Product layout is employed for____________________?

A. effective utilization of machine
B. continuous production
C. batch production
D. all of the above
E. none of the above

The process layout is best suited where______________?

A. mass production is envisaged
B. machines are arranged according to sequence of operation
C. few number of non-standardised units are to be produced
D. specialisation exists
E. bought out items are more

Military organisation is known as_______________________?

A. line organisation
B. functional organisation
C. line and staff organisation
D. all of the above
E. none of the above

The main advantage of line organisation is its_______________?

A. defined responsibilities at all levels
B. effective command and control
C. rigid discipline in the organisation
D. ability of quick decision at all levels
E. all of the above

The salient feature of functional organisation is________________?

A. separation of planning and design part
B. strict adherence to specification
C. each individual maintains functional efficiency
D. work is properly planned and distributed
E. all of the above

Templates are used for_________________?

A. a planning layout
B. copying complicated profiles
C. advancing a programme in automatic machines
D. flow of material
E. none of the above

Routing prescribes the_________________?

A. flow of material in the plant
B. proper utilization of machines
C. proper utilization of man power
D. inspection of final product
E. none of the above

Standard time is defined as ____________________?

A. normal time + allowances
B. normal time + idle time
C. normal time + idle time + allowances
D. only normal time for an operation
E. none of the above

The grouping of activities into organisational units is called_________________?

A. higher level management
B. corporate plans
C. functional authority
D. departmentatidn
E. company policy

Which of the following organisations is best suited for steel plants__________________?

A. line organisation
B. functional organisation
C. staff organisation
D. line, staff and functional organisations
E. scalar organisation

Which of the following is independent of sales forecast______________?

A. productivity
B. production planning
C. inventory control
D. production control
E. capital budgeting

Inventory management consists of__________________?

A. stock control system
B. state of merchandise methods of stroing and maintenance etc
C. effective running of stores
D. all of the above
E. none of the above

Engineering Materials Mcqs

Inventory control in production, planning and control aims at________________?

A. ensuring against market fluctuations
B. achieving optimisation
C. acceptable customer service at low capital investment in inventory
D. discounts allowed in bulk purchase
E. regulate supply and demand

Statistical quality control techniques are based on the theory of___________________?

A. statistics
B. quality
C. probability
D. all of the above
E. none of the above

Under the Apprenticeship Act___________________?

A. industries have to train apprentices ac-cording to their requirement
B. all industries have to necessarily train the apprentices
C. all industries employing more than 100 workers have to recruit apprentices
D. only industries employing more than 500 workers have to recruit apprentices
E. all industries other than small scale industries have to train apprentices

Acceptance sampling is widely used in________________?

A. job production
B. batch production
C. mass production
D. all of the above
E. none of the above

The term ‘value’ in value engineering refers to_______________?

A. selling price of the product
B. total cost of the product
C. utility of the product
D. manufactured cost of the product
E. depreciation value

In the perpetual inventory control, the material is checked when it reaches its________________?

A. minimum value
B. maximum value
C. alarming value
D. average value
E. original value

Merit Rating is the method of determining worth of_______________?

A. machine
B. an individual employee
C. a particular division in workshop
D. a job
E. overall quality

Works cost implies________________?

A. factory cost
B. primary cost
C. factory expenses
D. primary cost + factory expenses
E. none of the above

Standard time as compared to normal time is_______________?

A. greater
B. equal
C. smaller
D. there is no such correlation
E. none of the above

In which of the following layouts, the lines need to the balanced_______________?

A. fixed position layout
B. product layout
C. process layout
D. plant layout
E. functional layout

Which of the following layouts is suited to job production__________________?

A. process layout
B. fixed position layout
C. product layout
D. plant layout
E. functional layout

The amount deducted from the salary of workers towards employees provident fund is_______________?

A. credited into reserves of company
B. deposited in post office
C. deposited in nationalised bank
D. deposited in the account of worker with employer or Reserve Bank of India
E. deposited in the account of worker with Provident Fund Commissioner

Hydraulic Machines Mcqs

Current assets include_______________?

A. manufacturing plant
B. inventories
C. manufacturing plant and equipment
D. common stock held by the firm
E. all of the above

Job enrichment technique is applied to_________________?

A. overcome boring and demotivating work
B. reduce labour monotony
C. make people happy
D. all of the above
E. none of the above

In Halsey 50-50 plan, output standards are established______________?

A. from one’s judgement
B. from previous production records
C. by time study
D. all of the above
E. none of the above

An optimum project schedule implies_______________?

A. timely execution of project
B. lowest possible cost and shortest possible time for project
C. optimum utilization of men, machines and materials
D. to produce best results under given constraints
E. realistic execution time, minimum cost and maximum profits

Which one of the following represents a group incentive plan ?

A. Scanlon Plan
B. Bedaux Plan
C. Rowan Plan
D. Taylor Differential Piece Rate System
E. Halsey Premium Plan

In the Halsey system of wage incentive plan, a worker is ________________?

A. never a loser
B. ensured of minimum wages
C. not paid any bonus till his efficiency
D. paid as per efficiency
E. induced to do more work

Break-even analysis can be used for__________________?

A. short run analysis
B. there is no such criterion
C. average of above two run analysis
D. long run analysis
E. none of the above

PERT has following time estimate_________________?

A. two time estimate
B. one time estimate
C. three time estimate
D. four time estimate
E. nil time estimate

Which of the following incentive plansrensures a part of the swing to the worker and rest to the employer_______________?

A. Taylor plan
B. Emerson efficiency plan
C. Halsey premium plan
E. Gilberth plan

Which of the following plans motivates supervisors by paying a premium on time saved by workers_________________?

A. Rowan plan
B. Halsey plan
C. Haynes plan
D. Emerson’s plan
E. Taylor’s plan

In Lincoln plan (one type of group incentive plan), the amount of the profit which an .employee receives in addition to the guaranteed basic _________________?

pay/wages, is based on :
A. a job evaluation system
B. a merit rating system
C. a standard rating system
D. his individual performance
E. all of the above

‘Value’ for value engineering and analysis purposes is defined as_____________________?

A. sale able value
B. purchase value
C. depreciated value
D. present worth
E. function/cost

In the Halsey 50-50 plan, the following are rewarded more___________________?

A. past average workers
B. past poor workers
C. past good workers
D. all of the above
E. none of the above

Graphical method, simplex method, and transportation method are concerned with__________________?

A. break-even analysis
B. queing theory
C. linear programming
D. value analysis
E. tnaterial handling

Routing is essential in the following type of industry_________________?

A. assembly industry
B. job order industry
C. process industry
D. mass production industry
E. steel industry

For ship vessel industry the following layout is best suited_________________?

A. product layout
B. process layout
C. fixed position layout
D. plant layout
E. functional layout

CPM has following time estimate__________________

A. one time estimate
B. three time estimate
C. two time estimate
D. four time estimate
E. nil time estimate

The objective of time study is to determine the time required to complete a job by_______________?

A. slow worker
B. average worker
C. fast worker
D. new entrant
E. any one of the above

Tick the odd man out_______________?

A. Drucker
B. Taylor
C. McGregor
D. Galileo
E. Parkinson

The deductions for, employees provident fund start________________?

A. after 60 days of joining the service
B. immediately on joining the service
C. after 100 days of joining the service
D. after 240 days of joining the service
E. after one year of joining the service

Production Technology MCQs Latest – MCQs Competitive Mechanical Engineering