Competitive Software Engineering MCQs – Latest Software Management MCQs

Competitive Software Engineering MCQs – Latest Software Management MCQs

This post is comprising of latest ” Software Management MCQs – Latest Competitive Software Engineering MCQs “. Here you’ll get latest Software engineering mcqs for written test, interview with answers. If you want to improve your knowledge regarding Software engineering then read these mcqs of Design of Steel Structures.

Latest Software Engineering MCQs

By practicing these MCQs of Software Management MCQs – Latest Competitive Software Engineering MCQs , an individual for exams performs better than before. This post comprising of mechanical engineering objective questions and answers related to Software Management Mcqs “. As wise people believe “Perfect Practice make a Man Perfect”. It is therefore practice these mcqs of Software engineering to approach the success. Tab this page to check “Software Management” for the preparation of competitive mcqs, FPSC mcqs, PPSC mcqs, SPSC mcqs, KPPSC mcqs, AJKPSC mcqs, BPSC mcqs, NTS mcqs, PTS mcqs, OTS mcqs, Atomic Energy mcqs, Pak Army mcqs, Pak Navy mcqs, CTS mcqs, ETEA mcqs and others.

Latest Software Management Mcqs

The most occurred mcqs of Software Management in past papers. Past papers of Software Management Mcqs. Past papers of Software Management Mcqs . Mcqs are the necessary part of any competitive / job related exams. The Mcqs having specific numbers in any written test. It is therefore everyone have to learn / remember the related Software Management Mcqs. The Important series of Software Management Mcqs are given below:

A software ______________ provides the framework from which a comprehensive plan for software development can be established?

A. product
B. people
C. process
D. none of the mentioned

Which of the following is not an effective software project management focus ?

A. product
B. people
C. popularity
D. process

If an Indirect approach is taken, then the sizing approach is represented as_______________?

A. Fuzzy Logic
B. FP
C. LOC
D. LOC and FP

The expected value for the estimation variable (size), S, can be computed as a weighted average of the optimistic(Sopt), most likely (Sm), and pessimistic (Spess) estimates given as___________________?

A. EV = (Sopt + 2Sm + Spess)/6
B. EV = (Sopt + 4Sm + Spess)/6
C. EV = (Sopt + 4Sm + Spess)/4
D. EV = (Sopt + 2Sm + Spess)/4

If a Direct approach to software project sizing is taken, size can be measured in__________________?

A. LOC
B. LOC and FP
C. FP
D. None of the mentioned

How many forms exists of Barry Boehm’s COCOMO Model ?

A. Four
B. Three
C. Two
D. No form exists

Which software project sizing approach develop estimates of the information domain characteristics ?

A. Function point sizing
B. Standard component sizing
C. Change sizing
D. Fuzzy logic sizing

Why is decomposition technique required ?

A. Developing a cost and effort estimate for a software project is too complex
B. Software project estimation is a form of problem solving
C. All of the mentioned
D. None of the mentioned

Which of the following strategies means that the impact of the risk will be reduced ?

A. Contingency plans
B. Minimization strategies
C. Avoidance strategies
D. All of the mentioned

Which of the following risks are derived from the software or hardware technologies that are used to develop the system ?

A. Estimation risks
B. Technology risks
C. Managerial risks
D. Organizational risks

Which of the following risk is the failure of a purchased component to perform as expected ?

A. Product risk
B. Business risk
C. Project risk
D. Programming risk

Which of the following term is best defined by the statement:”the degree of uncertainty that the product will meet its requirements and be fit for its intended use.”?

A. Performance risk
B. Support risk
C. Cost risk
D. Schedule risk

Which of the following term is best defined by the statement: “There will be a change of organizational management with different priorities.”?

A. Technology change
B. Staff turnover
C. Management change
D. Product competition

Software Testing And Quality Management Mcqs

Which risks are associated with constraints imposed by management or the marketplace ?

A. Business impact risks
B. Product size risks
C. Process definition risks
D. Development environment risks

Which of the following is a systematic attempt to specify threats to the project plan ?

A. Performance risk
B. Risk identification
C. Support risk
D. Risk projection

What threatens the quality and timeliness of the software to be produced ?

A. Business risks
B. Known risks
C. Project risks
D. Technical risks

Which of the following is not a business risk ?

A. losing budgetary or personnel commitment
B. losing the support of senior management due to a change in focus or change in people
C. lack of documented requirements or software scope
D. building an excellent product or system that no one really wants

Which risks are associated with the overall size of the software to be built or modified ?

A. Process definition risks
B. Business impact risks
C. Product size risks
D. Development environment risks

What threatens the viability of the software to be built ?

A. Project risks
B. Business risks
C. Known risks
D. Technical risks

What is the product of the probability of incurring a loss due to the risk and the potential magnitude of that loss ?

A. Risk exposure
B. Risk analysis
C. Risk prioritization
D. All of the mentioned

COCOMO stands for____________________?

A. Constructive cost model
B. Constructive cost estimation model
C. Comprehensive cost model
D. Complete cost estimation model

Which one is not a risk management activity ?

A. Risk control
B. Risk generation
C. Risk assessment
D. None of the mentioned

Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?

A. Process-Based Estimation
B. FP-Based Estimation
C. COCOMO
D. Both FP-Based Estimation and COCOMO

Which version of COCOMO states that once requirements have been stabilized, the basic software architecture has been established ?

A. Early design stage model
B. Application composition model
C. Post-architecture-stage model
D. All of the mentioned

Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?

A. Post-architecture-stage model
B. Early design stage model
C. Application composition model
D. All of the mentioned

Software Design Mcqs

COCOMO was developed initially by _____________________ ?

A. Rajiv Gupta
B. B.Beizer
C. B.W.Bohem
D. Gregg Rothermal

COCOMO-II was developed at _____________________?

A. MIT
B. University of Southern California
C. University of Texas
D. IIT-Kanpur

What all has to be identified as per risk identification ?

A. Vulnerabilities
B. Threats
C. Consequences
D. All of the mentioned

Which one is not a size measure for software product ?

A. Halstead’s program length
B. LOC
C. Function Count
D. Cyclomatic Complexity

Estimation of size for a project is dependent on___________________?

A. Time
B. Cost
C. Schedule
D. None of the mentioned

Which one is not a stage of COCOMO-II ?

A. Early design estimation model
B. Comprehensive cost estimation model
C. Application Composition estimation model
D. Post architecture estimation model

Which model assumes that systems are created from reusable components, scripting or database programming ?

A. An application-composition model
B. A reuse model
C. A post-architecture model
D. An early design model

Which model is used during early stages of the system design after the requirements have been established ?

A. A post-architecture model
B. An application-composition model
C. A reuse model
D. An early design model

Which model is used to compute the effort required to integrate reusable components or program code that is automatically generated by design or program translation tools ?

A. A post-architecture model
B. An application-composition model
C. A reuse model
D. An early design model

Which of the following states that work expands to fill the time available ?

A. Pricing to win
B. CASE tools
C. Parkinson’s Law
D. Expert judgement

Which technique is applicable when other projects in the same analogy application domain have been completed ?

A. Expert judgement
B. Algorithmic cost modelling
C. Estimation by analogy
D. Parkinson’s Law

Which of the following costs is not part of the total effort cost ?

A. Costs of providing heating and lighting office space
B. Costs of networking and communications
C. Costs of lunch time food
D. Costs of support staff

A _______________ is developed using historical cost information that relates some software metric to the project cost ?

A. Algorithmic cost modelling
B. Estimation by analogy
C. Expert judgement
D. Parkinson’s Law

A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ?

A. CLASS
B. JAD
C. FAST
D. None of the mentioned

CLSS stands for_____________________?

A. conveyor line sorting system
B. conveyor line sorting speed
C. conveyor line sorting software
D. conveyor line sorting specification

The environment that supports the software project is called_______________________?

A. FAST
B. SEE
C. CLSS
D. CBSE

Software Management Mcqs

What is related to the overall functionality of the delivered software ?

A. Function-related metrics
B. Size-related metrics
C. Product-related metrics
D. None of the mentioned

Which of the following is not achieved by an automated estimation tools ?

A. Predicting software cost
B. Predicting staffing levels
C. Predicting software schedules
D. Predicting clients demands

Which of the following are parameters involved in computing the total cost of a software development project ?

A. Effort costs
B. Hardware and software costs
C. Travel and training costs
D. All of the mentioned

What can be used to complement decomposition techniques and offer a potentially valuable estimation approach in their own right ?

A. Decomposition techniques
B. Empirical estimation models
C. Automated estimation tools
D. Both Automated estimation tools and Empirical estimation models

Which of the following is not an option to achieve reliable cost and effort estimate ?

A. Base estimates on similar projects that have already been completed
B. Use relatively simple decomposition techniques to generate project cost and effort estimates
C. Use one or more empirical models for software cost and effort estimation
D. The ability to translate the size estimate into human effort, calendar time, and dollars

The project planner examines the statement of scope and extracts all important software functions which is known as___________________?

A. Planning process
B. Decomposition
C. Association
D. All of the mentioned

Which of the following is not considered as a risk in project management ?

A. Product competition
B. Specification delays
C. Testing
D. Staff turnover

A 66.6% risk is considered as__________________?

A. low
B. very low
C. moderate
D. high

Which of the following is/are main parameters that you should use when computing the costs of a software development project ?

A. hardware and software costs
B. travel and training costs
C. effort costs (the costs of paying software engineers and managers)
D. all of the mentioned

Which of the following is an important factor that can affect the accuracy and efficacy of estimates ?

A. Project size
B. Project complexity
C. Planning process
D. Degree of structural uncertainty

Quality planning is the process of developing a quality plan for__________________?

A. customers
B. project
C. team
D. project manager

The process each manager follows during the life of a project is known as ___________________?

A. Manager life cycle
B. Project Management
C. Project Management Life Cycle
D. All of the mentioned

What describes the data and control to be processed ?

A. External hardware
B. Software scope
C. Planning process
D. Project complexity

Which of the following is incorrect activity for the configuration management of a software system ?

A. Internship management
B. Version management
C. Change management
D. System management

Which of the following is not project management goal ?

A. Delivering the software to the customer at the agreed time
B. Keeping overall costs within budget
C. Maintaining a happy and well-functioning development team
D. Avoiding customer complaints

Identify the sub-process of process improvement ___________________?

A. Process analysis
B. Process introduction
C. De-processification
D. Process distribution

Competitive Software Engineering MCQs – Latest Software Management MCQs